| Surface Preparation |
(A)All new woodwork should be well seasoned and treat knots to a smooth even surface. Remove all dust and loose particles before the application of the priming coat.
(B) New woodwork should be clean of all loose material, mould or other contaminants. Rub down with sandpaper and dust off prior to application.
|